Commit Graph

20 Commits

Author SHA1 Message Date
abf16b2b8b
Removed old trace 2023-10-22 16:11:23 +01:00
72df8bd013 Removed PG circuit 2023-10-22 17:07:40 +01:00
3f69747ab4
Correct Q3 numbering 2023-10-21 21:49:02 +01:00
4eccce9717 Removed GPS connector and associated components 2023-10-20 21:49:17 +01:00
cb9acfc9e9
Removed 3D models for R13 and R14 (NM) 2023-08-06 16:08:58 +01:00
973dbc2fc3 Updated references for test points 2023-08-06 16:40:19 +01:00
8c4897f99c Added 3D model to D8 2023-08-05 22:02:41 +01:00
d39dc6f0a5
Changed hole size from M2 to M1 2023-08-04 18:28:00 +01:00
159c4a5428
Added JLCPCB order text 2023-08-04 12:19:35 +01:00
ab5258bbe6 Added 3D models to TVS diodes 2023-08-04 13:00:40 +01:00
c2de916f4b Replaced SIM connector and status LEDs, tweaked ss 2023-08-04 12:55:54 +01:00
9e8cda3414
Adjusted via location to be off silkscreen 2023-08-03 15:49:07 +01:00
6fbfaf6d6c Moved D4 silkscreen for DRC 2023-08-02 20:42:57 +01:00
dba561662a Created copper keep out area below U.FL connector 2023-08-02 20:11:35 +01:00
2e7cbce038 Moved polarised capacitor silkscreen 2023-08-02 19:58:56 +01:00
1645bbb780 Corrected TVS footprints 2023-08-02 19:57:02 +01:00
31dbf1d95c
Added skew matching on USB differential pair 2023-07-27 17:42:47 +01:00
aefee9e3f1 Removed JLCPCB order number 2023-07-27 15:36:17 +01:00
52af9a0f66 Corrected USB data traces for 90ohm impedance 2023-07-27 15:33:15 +01:00
27a7c728f7 Rename project to openCom LTE 2023-07-26 19:37:58 +01:00